Body
If it takes 5000 blocks to BUILD A 4 BEDROOM Bungalow, at 45 piece of blocks for 1 bag of cement @ #5000 per bag, and 10 bags for a trip of sand @ 45000 and 2000 as labor per 50 piece of blocks moulded and 12,000 for builder's labour from foundation to linted.
CALCULATE THE NUMBER of MATERIALS needed, the AMOUNT of MONEY FOR MATERIAL AND LABOUR. Then total cost = ??
OYA THE MATHEMATICIANS OVER
Image
Likes
No comments yet
Only members can post comments. Login or register to post comments.